Substructure Completes Hydrographic Clearance Survey at Naval Shipyard

In early 2011, Substructure completed a hydrographic clearance survey of the Portsmouth Naval Shipyard. This survey was to ensure that all of the materials for the cofferdam, which had been put in place during a dry-dock expansion, were removed at the end of the job. For this project, Substructure utilized its multi-beam sonar and its survey vessel Orion.

http://media.defenseindustrydaily.com/images/SHIP_SSN-778_USS_New_Hampshire_At_Portsmouth_Naval_Shipyard_lg.jpg

Previous article:
Next article:

Latest News

  • Substructure Demos Survey Vessel Orion February 14-18

    demo01

  • Diver dressed in a double-suit in preparation for a clear-well dive.

    double_suit

  • Multibeam point cloud of sunken boats.

    mt_sinai_wreck_point_cloud_crop

  • Multibeam point cloud of a bridge support structure and nearby debris field.

    hwy_w4_60-0-270

  • Deployed equipment trailer with diver air compressor, welder, hydraulic power pack and

    OLYMPUS DIGITAL CAMERA

  • Multibeam point cloud of a bridge support structure.

    richmond_point_cloud