1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19



















Cleaned traveling screens staged
Concrete surface scarified for installation of guide
Custom built stop log guides offloaded at site
Diver and tender working preparing to burn old guide for removal
Hydrographic survey data of the diffuser
Installing inner stop log
Installing outer stop log
New Carrier links installed on upper drive
New stop log guide lowered into stop log slot
Newly designed and installed torque arm and transmissinon brackets
Newly designed stoplogs receiving final preparation prior to installation
Riggers preparing old components for removal
Silver solder final plumbing installation
Stop log guide positioned and ready for anchor bolt installation and grout
Survey data of the pumpwall
Survey data outside of the pumphouse
Technician realigning foot wheel mounting plate to level foot wheel shaft
Upper Drive assembly lowered into place
Upper drive assembly ready for installation